Installation of electricity meter DTSU 666 (three-phase)

This page describes the installation and connection of the three-phase meter DTSU 666.
Table of contents

    ATTENTION

    The SOLARWATT Inverter is only compatible with the DDSU and DTSU Solarwatt version (software version). You can only obtain the Solarwatt version of these meters from Solarwatt or Solarwatt partners. You can recognize the Solarwatt version by the Solarwatt logo on the label of the electricity meter packaging (see illustration).

    Label electricity meter Solarwatt version

    Danger

    Risk of electric shock or fire

    • Before connecting the cables, make sure that the meter is undamaged.
    • Make sure that the earthing wire is securely installed.
    • Before switching on the appliance, make sure that the wiring is correct.
    Overview of DDSU counters

    Technical data

    Dimensions: 100 x 72 x 65.5 mm (4 HP)

    Max. Current: one CT terminal can be used for a measuring range of up to 100 A

    CT terminal cable length: 6 m (can be cut to size or extended up to 15 m)

    Max. Distance to the inverter: 100 m

    Installation of the meter with a THREE inverter in the three-phase grid

    Observe all Safety Instructions and requirements for the installer.

    The Inverter vision three is supplied with the DTSU 666 duo RS485 CT three-phase electricity meter (Solarwatt version) for recording excess electricity and electricity consumption.

    When installing the meter, please refer to the wiring diagrams provided by Solarwatt for single-phase and Wiring diagrams for single-phase and three-phase grids provided by Solarwatt.

    • Hook the meter onto the top edge of the top-hat rail in the house connection box and press down until it clicks into place
    Mounting the meter on the top-hat rail

    The voltage is measured via the direct connections of the DTSU 666:

    • PIN 3 -> L1 Ua
    • PIN 6 -> L2 Ub
    • PIN 9 -> L3 Ub
    • PIN10 -> N Un

    The current is always measured via the enclosed CT terminals, which are connected to phase L1, L2 and L3 of the domestic installation.
    The CT terminals must be positioned in the switch cabinet so that the total current can be measured before transfer to the domestic electricity meter.

    A CT terminal can be used for a measuring range of up to 100 A.

    Current and voltage measurement DTSU

    DTSU current and voltage measurement - pin assignment

    Pin of the meterPort/deviceConductor cross sectionOuter diameter
    direct voltage measurement

    3

    L1

    4 mm2 - 25 mm2
    multi-core outdoor copper cable
    5 - 10 mm

    6

    L2

    9

    L3

    10

    N

    Current measurement via CT terminal

    13

    Ia* (white)yellow

    -

    -

    14

    Ia (blue)

    16

    Ib* (white)green

    17

    Ib (blue)

    19

    Ic* (white)red

    21

    Ic (blue)

    ATTENTION

    Ensure that the current measurement direction of the CT terminal is correct. The arrow on the CT terminal points in the direction of the domestic consumer.

    First connect the cable, then close the CT terminals. You must adhere to this sequence so that the CT terminals are not damaged.

    • Connecting the cable for voltage measurement
    • Connect the cable for current measurement
    • only then connect the CT terminals

    The connection for communication with the Inverter three is made via the direct connections 24 and 25.

    • Configure the RJ45 plug for the connector with the Inverter vision three inverter
    • attach a waterproof plug housing (included in the scope of delivery of the inverter) to the plug on the inverter side for protection and mechanical strain relief
    • Connect the meter to the inverter using the RJ45 plug

    DTSU and Inverter ONE communication - pin assignment

    Pin of the meterPort/deviceConductor cross sectionOuter diameter
    Outer diameter Communication

    24

    Pin 2 Counter adapter on inverter

    0.25 mm2 - 1.5 mm2

    shielded, two-core twisted outdoor cable, min. Cat. 5e

    4 mm - 11 mm

    25

    Pin 1 Counter adapter on inverter

    5

    Pin 485A on the SOLARWATT Charger (optional)

    6

    Pin 485B on the SOLARWATT Charger (optional)

    Installing the meter with an Inverter ONE in the three-phase grid

    Observe all Safety Instructions and requirements for the installer.

    The three-phase electricity meter DTSU 666 duo RS485 CT (Solarwatt version) MUST be installed when using the SOLARWATT Inverter vision one in three-phase grids. ATTENTION: this meter is NOT part of the scope of delivery for the Inverter one. It is only included in the scope of delivery of the Inverter three.

    You must order the three-phase meter separately from Solarwatt for use in the three-phase grid.

    You can find the three-phase meter in the Solarwatt webshop here.

    For the installation of the meter, please refer to the wiring diagrams provided by Solarwatt Wiring diagrams for single-phase and three-phase grids.

    • Hook the meter onto the top edge of the top-hat rail in the house connection box and press down until it clicks into place
    Mounting the meter on the top-hat rail

    The voltage is measured via the direct connections of the DTSU 666:

    • PIN 3 -> L1 Ua
    • PIN 6 -> L2 Ub
    • PIN 9 -> L3 Ub
    • PIN10 -> N Un

    The current is always measured via the enclosed CT terminals, which are connected to phase L1, L2 and L3 of the domestic installation.
    The CT terminals must be positioned in the switch cabinet so that the total current can be measured before transfer to the domestic electricity meter.

    A CT terminal can be used for a measuring range of up to 100 A.

    Current and voltage measurement DTSU

    DTSU current and voltage measurement - pin assignment

    Pin of the meterPort/deviceConductor cross sectionOuter diameter
    direct voltage measurement

    3

    L1

    4 mm2 - 25 mm2
    multi-core outdoor copper cable
    5 - 10 mm

    6

    L2

    9

    L3

    10

    N

    Current measurement via CT terminal

    13

    Ia* (white)yellow

    -

    -

    14

    Ia (blue)

    16

    Ib* (white)green

    17

    Ib (blue)

    19

    Ic* (white)red

    21

    Ic (blue)

    ATTENTION

    Ensure that the current measurement direction of the CT terminal is correct. The arrow on the CT terminal points in the direction of the domestic consumer.

    First connect the cable, then close the CT terminals. You must adhere to this sequence so that the CT terminals are not damaged by overvoltage.

    • Connecting the cable for voltage measurement
    • Connect the cable for current measurement
    • only then connect the CT terminals

    The cable length of the CT terminal is 6 m. If the cable is too long, it can be cut to length. If the cable is too short, it can be extended up to 15 m.

    The connection for communication with the Inverter one is made via the direct connections 24 and 25.

    The meter adapter is included in the scope of delivery of the Inverter one.

    • Configure the meter adapter for the connector with the Inverter vision one inverter.
    • Wire end ferrules are only necessary if stranded wires are used
    • Connect the meter to the inverter using the meter adapter
    Communication DTSU and Inverter one

    DTSU and Inverter ONE communication - pin assignment

    Pin of the meterPort/deviceConductor cross sectionOuter diameter
    Outer diameter Communication

    24

    Pin 1 Counter adapter on inverter

    0.25 mm2 - 1.5 mm2

    shielded, two-core twisted outdoor cable, min. Cat. 5e

    4 mm - 11 mm

    25

    Pin 2 Counter adapter on inverter

    5

    Pin 485A on the SOLARWATT Charger (optional)

    6

    Pin 485B on the SOLARWATT Charger (optional)